Skip to content

CSCI2740 · Definition · Chapter 7 · Weighted interval scheduling

Predecessor index

0 steps of prerequisites below it

For activities numbered in nondecreasing finish order, the predecessor index p(i) is the largest j < i with f_j ≤ s_i, or 0 if there is none.

Taught in

Builds on

Nothing in the notes sits below this point: it is a starting point.

Used by

Possible roots and a review route need your own answers on these points. None are recorded yet, so none are suggested.

Longest chain down to a starting point

Nothing is recorded below this point: it is a starting point.

Back to the graph →Read the note 7.1 →

Vercel visit statistics and public-page performance measurements each require separate consent. Neither is needed to use the website.

Website function storage (used when needed)

Security, sign-in and your chosen preferences use storage when needed. This is separate from optional statistics.

Withdrawing stops future statistics. The page reloads if analytics code needs unloading. It does not delete data already sent.

Read Cookie and storage details